This bid is for water treatment services at Eastern Washington University's Rozell Plant, 1115 Cedar Street, Cheney, WA 99004, including the campus URC cooling tower.
This bid has closed.
Buyers often post the same work again. Set an alert below and we will email you when a similar Washington bid is posted.
What the job is
Systems: Five watertube boilers, five cooling towers sharing one sump, one deaerator, one chilled-water loop, the steam system, and one URC cooling tower.
Operating conditions: Boilers run continuously at 100 and 225 psi; chillers operate seasonally. Annual makeup water is approximately 4.28 million gallons for boilers and 750,000 gallons for cooling.
Treatment: Maintain silica cycles at or above 60 using existing Walchem dosing equipment, with direct chemical feed from 55-gallon drums.
Service: Supply chemicals and testing reagents; provide monthly onsite testing, monitoring, service reports, and staff training at no additional charge.
Response times: Onsite response to plant upsets within 12 hours; Certified Water Technologist support virtually within 24 hours or onsite within 48 hours.
Chemical supply: Manufacture chemicals at your primary facility within 400 miles of the plant, without toll-blending, and deliver within five business days. Include SDS and wastewater-compatible treatment products.
Pricing and term: Provide service costs and chemical unit prices for a three-year program, with two optional one-year extensions and an anticipated November 1, 2026 start. Raw and softened water analyses are currently unavailable.