Mini split: Remove the existing IT room system and install a new 2-ton ductless system with indoor and outdoor units, thermostat, new line set, power connections, condensate tie-in, startup, and commissioning.
This bid has closed.
Buyers often post the same work again. Set an alert below and we will email you when a similar Utah bid is posted.
What the job is
Roof stand: Install an elevated galvanized steel equipment platform per the provided roof details, including flashing and walk pads on all four sides. Replace existing electrical lines and connections, rerouting rooftop wiring beneath the roof deck as required.
Water heater: Remove and replace the existing heater with a smaller tank and relocate the regulating pump for servicing from ground level.
Pressure reducing valve: Rebuild the PRV station after hours; perform other plumbing work during regular hours.