Paving and accessibility: Remove existing concrete where needed; install concrete paths, stabilized aggregate paths, and ADA modifications. Aggregate paths require a 3-inch surface over a minimum 3-inch compacted granular base.
Landscaping and irrigation: Prepare planting soil, install plants and native seeding, and modify existing irrigation to accommodate new paths and planting areas.
Site furnishings: Supply and install black, powder-coated, surface-mounted backless metal benches and inverted-U bike racks.
Electrical option: Price all electrical work separately, including panels, outlets, conduit, wiring, grounding, and surge protection.
Schedule: Substantial completion within 180 calendar days of authorization to start, including winter shutdown; stage work to maintain public use.