Assessment and design: Assess existing RTUs, VAVs, and controls; verify equipment quantities and capacities; provide construction drawings and permits.
Can you do this job? Tell us your price.
We write the bid, handle the paperwork, and submit it for you. No upfront fees.
Got it.
You send a priceOne number, before October 27, 2026.
We bid itXL Eagle submits the bid as the main contractor.
You do the workIf it is awarded, you do the job as our subcontractor.
Equipment: Existing inventory lists 24 RTUs: five 10-ton, one 12.5-ton, three 15-ton, one 30-ton, one 35-ton, four 4-ton, one 40-ton, one 6-ton, and seven with unknown capacities. Replacement scope requires owner approval; new units must be Carrier, York, or equivalent.
Installation: Include removal and disposal, electrical and gas/plumbing reconnections, fire alarm reconnections where needed, roof curbs/adapters and repairs, and abatement as needed.
Controls and testing: Include approved DDC controls integrated with the existing Niagara Tridium system, complete duct cleaning, air balancing, and certified commissioning.
Site and warranty: Phase work to keep the facility operational; include all labor, materials, equipment, and a minimum one-year materials and workmanship warranty.