This bid is for HVAC replacement in the west administration wing of Kraft Administrative Center, 1359 E. Saint Louis St., Springfield, MO 65802.
Due
December 17, 2026
26 days left
Location
Springfield, MO
Missouri
Posted on
Ionwave
Notice ID
SPS-2604
Please quote replacement of the HVAC equipment in the west administration wing of Kraft Administrative Center, 1359 E. Saint Louis St., Springfield, MO 65802.
Removal: Remove existing HVAC equipment, ductwork, refrigerant and condensate piping, and electrical connections as indicated.
New equipment: Install a VRF heat recovery system, a replacement dedicated outdoor air unit, four gas-fired rooftop units, and the mini-split equipment shown on the plans.
Installation: Ductwork, refrigerant and condensate piping, gas connections, electrical power, controls, roof supports, and weathertight roof penetrations.
Restoration: Ceiling and finish repairs, equipment startup, testing, and commissioning support.
Schedule: Site access June 1, 2027; interior substantial completion July 16, 2027; final completion July 31, 2027.
Occupancy: Building stays occupied, so work is outside normal operating hours unless approved.
Please confirm availability and send your quote by December 17, 2026.
The original documents
Deadline: December 17, 2026
See the original on spsebids.ionwave.net
Bidding it yourself? Get the full package and submit on Ionwave before December 17, 2026.
What they need
RemovalRemove existing HVAC equipment, associated ductwork, refrigerant and condensate piping, and electrical connections as indicated.
New equipmentInstall a VRF heat recovery system, replacement dedicated outdoor air unit, four gas-fired rooftop units, and mini-split equipment shown on the plans.
InstallationInclude ductwork, refrigerant and condensate piping, gas connections, electrical power, controls, roof supports, and weathertight penetrations.
Restoration and startupInclude ceiling and finish repairs, equipment startup, testing, and commissioning support.
ScheduleSite access June 1, 2027; interior substantial completion July 16, 2027; final completion July 31, 2027. Building remains occupied, with work outside normal operating hours unless approved.
PricingInclude all labor, materials, equipment, and a $25,000 allowance for unforeseen conditions.
Other recent awards in this industry in Missouri
Recent federal contract awards (federal buyers) in the same industry in Missouri, from USAspending.gov. These are other jobs, not the same work as this one. Do not use them as a price guide for this job.