Equipment: Two existing Marley NC8302EL2 cooling tower cells, 200 tons each; 600 GPM per cell at 95°F entering/85°F leaving water and 78°F wet bulb.
Due
November 12, 2026
4 days left
Location
Nevada
Posted on
Ionwave
Notice ID
5587-GS
Please quote repairs to two cooling tower cells at UNLV’s Greenspun Hall, 4505 Maryland Parkway, Las Vegas, NV 89154-1033, with separate pricing for replacement with two new towers.
Equipment: Two existing Marley NC8302EL2 cells, 200 tons each, handle 600 gallons per minute per cell at 95°F entering water, 85°F leaving water, and 78°F wet bulb temperature.
Repairs: Replace fill, drift eliminators, stainless steel fill supports and casing panels, fan cylinders and guards, fan assemblies, gear reducers, couplings, two 10 HP motors, 268 nozzles, and specified stainless steel structural supports; assess and repair deteriorated basins and remaining structural components, including corrosion protection.
Replacement: Use two Marley NC8403MAN2 towers or equivalent; include removal and disposal, lifting equipment, structural engineering and modifications, piping, electrical connections, and controls connection and testing.
Installation: Include labor, materials, permits, inspections, disposal, flushing and water treatment, startup and performance checks, four hours of training, and electronic operating manuals.
Schedule: Work on one tower at a time while keeping one available; normal hours are Monday–Friday, 8 a.m.–5 p.m.; finish installation, testing, and startup checks before spring 2027.
Warranty: Include a one-year labor and materials warranty.
Please confirm availability and send your quote by November 12, 2026.
The original documents
Deadline: November 12, 2026
See the original on nevada.ionwave.net
Bidding it yourself? Get the full package and submit on Ionwave before November 12, 2026.
What they need
RepairsReplace fill, drift eliminators, stainless steel fill supports and casing panels, fan cylinders/guards, fan assemblies, gear reducers, couplings, two 10 HP motors, 268 nozzles, and specified stainless steel structural supports. Assess and repair deteriorated basins and remaining structural components; include corrosion protection.
Replacement optionSeparately itemize removal and disposal of existing towers and installation of two new towers, Marley NC8403MAN2 or equivalent, including rigging, structural engineering/modifications, piping, electrical connections, and controls integration/testing.
Complete installationInclude labor, materials, permits, inspections, disposal, flushing/water treatment, commissioning, four hours of training, electronic operating manuals, and a one-year labor/material warranty.
SchedulePhase work one tower at a time, keeping one available for operation. Normal hours are Monday–Friday, 8 a.m.–5 p.m.; complete installation, testing, and commissioning before spring 2027.
Past history: who won Electrical work in Nevada
Recent federal contract awards (federal buyers) in the same industry in Nevada, from USAspending.gov. These are comparable jobs, not earlier rounds of this exact solicitation.
Typical award:$9,600 to $32Kmiddle half of 15 recent awards · median $28K