Equipment: Replace 35 dual-duct terminal units across the ground, first, and second floors; retain 8 existing units. New units range from approximately 160–3,500 CFM with 4–16-inch inlets. Basis of design: Titus DEDV; approved equivalents by Price or Trane.
This bid has closed.
Buyers often post the same work again. Set an alert below and we will email you when a similar Georgia bid is posted.
What the job is
Installation: Include temperature sensors, associated duct replacement, duct cleaning, insulation, vibration isolation, and equipment identification.
Controls and power: Replace pneumatic controls with digital controls, extend existing 120V power, and provide 24V controls power. Include ALC-performed system integration, programming, wiring, startup, and training, with a one-year controls warranty and five-year upward compatibility guarantee.
Testing: Include independent AABC- or NEBB-certified testing and balancing.
Schedule: Complete within 95 calendar days between spring semester end and one week before fall term. CH2182 requires after-hours replacement; no replacement in CH1201 or CH1204 from May 18–June 11, 2027.
Site visit: Required conference and tour on October 20, 2026, at 10:00 a.m. at Building CH’s front entrance; attendees must sign in and out.
Pricing clarification: Documents contain conflicting references to AHU replacement and Siemens controls. Please identify scope and controls assumptions in your quote pending clarification.