Controls: Remove existing hydraulic HVAC controls and install, program, and start up a new DDC/BAS system with Niagara N4 Supervisor, two workstations, and interfaces to existing building equipment.
Can you do this job? Tell us your price.
We write the bid, handle the paperwork, and submit it for you. No upfront fees.
Got it.
You send a priceOne number, before October 22, 2026.
We bid itXL Eagle submits the bid as the main contractor.
You do the workIf it is awarded, you do the job as our subcontractor.
Sensors and valves: Include nine multizone AHU discharge temperature sensors, five return duct temperature sensors for zones 1, 2, 3, 5, and 7, replacement wall sensors, and control valve replacements per drawings.
Kitchen ventilation: Replace the gas-fired makeup air unit and kitchen hood exhaust fan, including associated controls and BAS connections.
Chilled water controls: Coordinate new chiller controls integration, replace supply/return temperature and flow devices, and integrate the existing chilled water pump.
Data requirements: Configure BAS point names, histories, and alarms to CEMCS standards for integration by the owner.