Generator: Minimum 25 kW standby after derating, 60 Hz, 120/208 V, 3-phase, 4-wire, with 100 A breaker. Size for sequential pump starts up to 31.99 kW/42.7 kVA, with maximum 30% voltage dip and 10% frequency dip; include a sizing report.
Due
November 19, 2026
11 days left
Location
Connecticut
Posted on
OpenGov
Notice ID
26/27-20
Please quote a complete standby diesel generator installation at Love Lane Pump Station, 90 Love Lane, Manchester, CT 06040.
Generator: At least 25 kW standby output after adjustment for site conditions, 60 Hz, 120/208 V, 3-phase, 4-wire, and a 100 A breaker; sized for sequential pump starts up to 31.99 kW/42.7 kVA with no more than 30% voltage drop and 10% frequency drop.
Enclosure: Green aluminum Level 2 sound-reducing enclosure rated for 180 mph winds and no more than 72 dBA at 23 feet; include controller, battery, charger, heater, and remote emergency stop.
Fuel: UL 142 double-wall tank beneath the generator with at least 48 hours of fuel at full standby output; state usable gallons, full-load fuel use, and runtime, and initially fill to 85–90% with ultra-low-sulfur diesel.
Transfer switch: UL 1008 switch, at least 100 A, 208/120 V, 3-pole solid neutral, open transition with in-phase monitor; include a new enclosure if needed and automatic start and power transfer within 10 seconds.
Installation: Include concrete pad, anchoring, trenching, at least three conduits, wiring, grounding, surface repairs, and alarm connections to existing monitoring; place generator, tank, and switch at least 2 feet above base flood elevation or the stricter required height.
Completion: Include factory test report, startup, 2-hour full-load test, pump-start test, alarm demonstration, 2 hours of training, electronic operating and maintenance manuals, and drawings showing the completed installation; warranties must cover the generator for at least 2 years/1,000 hours, switch for 2 years, and workmanship for 1 year.
Please confirm availability and send your quote by November 19, 2026.
The original documents
Deadline: November 19, 2026
See the original on procurement.opengov.com
Bidding it yourself? Get the full package and submit on OpenGov before November 19, 2026.
What they need
EnclosureGreen aluminum Level 2 sound-attenuated enclosure, rated for 180 mph winds and maximum 72 dBA at 23 feet; include controller, battery, charger, heater, and remote emergency stop.
Fuel tankUL 142 dual-wall sub-base tank providing at least 48 hours at 100% standby rating. State usable gallons, full-load fuel consumption, and runtime; include initial ULSD fill to 85–90% of usable capacity.
Transfer switchUL 1008, minimum 100 A, 208/120 V, 3-pole solid neutral, open transition with in-phase monitor; include a new enclosure if needed and automatic start/transfer within 10 seconds.
InstallationConcrete pad, anchorage, trenching, at least three conduits, wiring, grounding, and surface restoration. Install generator, tank, and transfer switch at least 2 feet above base flood elevation or the stricter required elevation; connect alarm contacts to existing telemetry.
CommissioningFactory test report, startup, 2-hour rated-load bank test, pump-start test, alarm demonstration, 2 hours of training, and electronic O&M manuals and as-builts.
WarrantyGenerator minimum 2 years/1,000 hours, transfer switch 2 years, and workmanship 1 year.
Past history: who won Electrical work in Connecticut
Recent federal contract awards (federal buyers) in the same industry in Connecticut, from USAspending.gov. These are comparable jobs, not earlier rounds of this exact solicitation.
Typical award:$17K to $110Kmiddle half of 15 recent awards · median $64K