This bid is for flooring replacement at Southern Operations, 23300 Castle Street, Riverside, CA 92518.
This bid has closed.
Buyers often post the same work again. Set an alert below and we will email you when a similar California bid is posted.
What the job is
Removal: Demolish and dispose of approximately 11,870 sq. ft. of existing flooring and 5,200 linear ft. of cove base.
New flooring: Supply and install commercial LVP with full-spread adhesive; 4.5 mm nominal thickness, 20 mil wear layer, square edges, and friction-grip backing. Karndean Commercial LooseLay, Tarkett iD Inspiration Loose Lay, Polyflor Simplay, Invictus Maximus/Ultimus, or approved equivalent.
Cove base: Supply and install approximately 5,200 linear ft. of thermoplastic rubber cove base, 4 inches high and 1/8 inch thick, in continuous 120-foot rolls with molded exterior corners.
Preparation and finishing: Include adhesive removal, subfloor leveling and moisture mitigation, carpet-to-LVP transitions, a 300 sq. ft. installation mockup, and final cleanup.
Site visit: Mandatory walkthrough October 23, 2026, at 10:00 a.m.; verify measurements and material quantities.
Scheduling: Anticipated start December 1, 2026; work Monday–Friday, 8:00 a.m.–5:00 p.m., excluding holidays, while maintaining safe access in occupied areas.
Pricing: Itemize LVP materials, rubber base materials, demolition/disposal, and installation. Include all labor, equipment, permits, taxes, fees, applicable prevailing wages, and a separate 10% contingency for unforeseen repair labor.