Area and removal: Approximately 12,600 SF across the day room, sally port, and 54 cells; remove and dispose of existing VCT, adhesive, transitions, and associated flooring materials.
Can you do this job? Tell us your price.
We write the bid, handle the paperwork, and submit it for you. No upfront fees.
Got it.
You send a priceOne number, before October 22, 2026.
We bid itXL Eagle submits the bid as the main contractor.
You do the workIf it is awarded, you do the job as our subcontractor.
Surface preparation: Mechanically prepare concrete to the manufacturer's required surface profile and repair minor cracks, divots, spalls, and surface imperfections.
Flooring system: Manufacturer-supported, compatible system with 100% solids epoxy primer, epoxy body coat with chips broadcast to rejection, epoxy grout coat, and UV-stable satin urethane topcoat. Provide a slip-resistant finish resistant to heavy traffic, impact, abrasion, and cleaning chemicals.
Products: Sherwin-Williams, PPG, Tennant Coatings, or approved equals supported by technical data and warranty documentation.
Installation: Include detailing around drains, penetrations, thresholds, and fixed components; all transitions, edge terminations, protection, and daily debris removal.
Access and hours: Monday–Friday, 7:00 a.m.–4:00 p.m.; personnel require prior security approval. Coordinate work around occupied facility operations and verify dimensions before quoting.
Warranty and pricing: Include a minimum two-year workmanship warranty, manufacturer's material warranty, and all labor, materials, equipment, supervision, mobilization, disposal, and applicable taxes.