Preparation: Moisture testing, vapor mitigation if needed, mechanical profiling to a minimum 120-grit profile, and substrate repairs, including filling cracks 1/16 inch or wider.
Flooring: Three coats of non-slip, two-part epoxy, minimum 50-mil finished thickness; seamless, non-porous, chemical-resistant healthcare finish. Include decorative flakes except in patient rooms and finish flush with drains and cleanouts.
Cove base: Integral 4–6 inch base; designated areas require a 3/4-inch cove with epoxy extending 4 inches up the wall. Verify locations and dimensions during the required site visit.
Work conditions: Secure, occupied healthcare facility requiring infection-control coordination, surface protection, daily cleanup, and curing protection. Work in modules with approximately one week between units, Monday–Friday, 8 a.m.–5 p.m., excluding holidays. Supply generators for 220V equipment.
The basics
Due
November 5, 2026 18 days left
Where
Illinois
Posted on
BidBuy
Solicitation
B-54468
What the solicitation documents require
We read the solicitation documents for this bid (8 documents, 59 pages). Each item shows the file and page it came from. Check the original documents and any addenda before you bid.
Flooring removal and replacement services across about 16,230 sq ft of patient and non-patient areas at the Alton Forensic Center, by a qualified, licensed Contractor. (DHS IFB AMHC AFC Flooring B-54468.docx, p. 1)