This bid is for interior repairs at Healey Library's lower level, University of Massachusetts Boston, 100 Morrissey Boulevard, Dorchester, MA 02125, following water damage demolition.
Due
December 9, 2026
26 days left
Location
Dorchester, MA
Massachusetts
Posted on
COMMBUYS
Notice ID
BD-27-1109-UMBOS-BOS-135146
Please quote interior repairs and flooring at the lower level of Healey Library, University of Massachusetts Boston, 100 Morrissey Boulevard, Dorchester, MA 02125, after water damage demolition.
Drywall: Replace removed drywall about 24 inches above the floor (32 inches in rooms LL-16 and LL-19), matching existing thickness with a Level 4 finish.
Painting: Prepare and paint affected walls floor to ceiling to match specified finishes, plus designated doors, frames, and seven interior window frames.
Flooring: Install new VCT matching the existing lobby flooring and both contractor-furnished and owner-furnished carpet tile, including substrate preparation, adhesives, and transitions.
Demolition: Remove remaining flooring and adhesive where required, including VCT in LL-68 and LL-70, and install resilient wall base at flooring and drywall repair areas.
Additional work: Install owner-furnished acoustical panels in LL-49, finish the drywall-to-panel transition, move furniture as needed, and provide final cleaning.
Schedule: Substantial completion within 28 calendar days of authorization to start.
Please confirm availability and send your quote by December 9, 2026.
The original documents
Deadline: December 9, 2026
See the original on www.commbuys.com
Bidding it yourself? Get the full package and submit on COMMBUYS before December 9, 2026.
What they need
DrywallReplace removed drywall approximately 24 inches above the floor, and 32 inches in rooms LL-16 and LL-19; match existing thickness and provide a Level 4 finish.
PaintingPrepare and paint affected walls floor to ceiling to match specified finishes; paint designated doors, frames, and seven interior window frames.
FlooringInstall new VCT matching the existing lobby flooring and both contractor-furnished and owner-furnished carpet tile, including substrate preparation, adhesives, and transitions.
Demolition and baseRemove remaining flooring and adhesive where required, including VCT in LL-68 and LL-70; install resilient wall base at flooring replacement and drywall repair areas.
Additional workInstall owner-furnished acoustical panels in LL-49, finish the drywall-to-panel transition, move furniture as needed, and provide final cleaning.
ScheduleSubstantial completion within 28 calendar days of authorization to start. Mandatory site visit November 19, 2026, at 10:00 a.m. EST; meet outside Healey Library at plaza level.
Past history: who won Construction & Renovation work in Massachusetts
Recent federal contract awards (federal buyers) in the same industry in Massachusetts, from USAspending.gov. These are comparable jobs, not earlier rounds of this exact solicitation.
Typical award:$471K to $1.7Mmiddle half of 14 recent awards · median $943K