This bid is for air conditioning unit replacement at the Emery RCS radio site, 825 Plaskon Lane, Potrero, CA 91963.
Due
December 15, 2026
19 days left
Location
Potrero, CA
California
Posted on
sdbuynet.sandiegocounty.gov
Notice ID
13514
Please quote supplying and installing one wall-mounted Bard 2-ton W24A2-A0ZXP4XXJ air conditioning unit with low ambient control, one ICM492 control, and one RSH50 surge protective device (or equivalents) at the Emery RCS radio site, 825 Plaskon Lane, Potrero, CA 91963.
Equipment: One wall-mounted Bard 2-ton W24A2-A0ZXP4XXJ with low ambient control, one ICM492 control, and one RSH50 surge protective device, or equivalent products.
Installation: Remove and properly dispose of the existing unit; include new mounting hardware, electrical whips, control wiring, supply and return metal transitions, sealing, connections, testing, and cleanup.
Schedule: Finish within 30 calendar days of agreement start, Tuesday to Thursday, 7:00 AM to 4:00 PM Pacific, excluding holidays, with five business days' advance scheduling.
Site visit: Mandatory walkthrough December 8, 2026 at 10:00 AM Pacific; RSVP by December 4 at noon Pacific. Access is escorted and a high-clearance 4x4 is recommended.
Qualifications: Active California C-20 license and DIR registration required; prevailing wages apply.
Warranty: Full manufacturer's warranty plus a one-year installation and labor warranty.
Please confirm availability and send your quote by December 15, 2026.
What it takes to win this job
No close past price for this exact job. Past awards for this kind of work were too far apart in size and price to give one fair number.
Price it from your own costs. Ask the buyer what they paid the last time they bought this.
To win it, you need
Qualifications: An active California C-20 license and DIR registration are required.
Mandatory walkthrough: Attend December 8, 2026, at 10:00 AM Pacific; RSVP by December 4 at noon Pacific.
Required equipment: Supply and install a Bard W24A2-A0ZXP4XXJ with low ambient control, an ICM492 control, and an RSH50 surge protective device, or equivalents.
Schedule: Finish within 30 calendar days of agreement start, scheduling installation five business days ahead for Tuesday, Thursday, 7:00 AM, 4:00 PM Pacific, excluding holidays.
Quote requirements: Itemize equipment and labor, include all project costs, prevailing wages, the full manufacturer’s warranty and a one-year installation and labor warranty, and exclude sales tax.
The original documents
Deadline: December 15, 2026
See the original on sdbuynet.sandiegocounty.gov
Bidding it yourself? Get the full package and submit on sdbuynet.sandiegocounty.gov before December 15, 2026.
What they need
EquipmentSupply and install one wall-mounted Bard 2-ton W24A2-A0ZXP4XXJ with low ambient control, one ICM492 control, and one RSH50 surge protective device, or equivalent products.
InstallationRemove and properly dispose of the existing unit; include new mounting hardware, electrical whips, control wiring, supply and return metal transitions, sealing, connections, testing, and cleanup.
ScheduleComplete within 30 calendar days of agreement start. Installation hours are Tuesday–Thursday, 7:00 AM–4:00 PM Pacific, excluding holidays, with five business days’ advance scheduling.
Site visitMandatory walkthrough December 8, 2026, at 10:00 AM Pacific; RSVP required by December 4 at noon Pacific. Access is escorted; a high-clearance 4x4 is recommended.
Qualifications and warrantyActive California C-20 license and DIR registration required. Include prevailing wages, full manufacturer’s warranty, and a one-year installation and labor warranty.
PricingItemize equipment and labor, include all project costs, and exclude sales tax.
Other recent awards in this industry in California
Recent federal contract awards (federal buyers) in the same industry in California, from USAspending.gov. These are other jobs, not the same work as this one. Do not use them as a price guide for this job.