Outdoor equipment: Two 12-ton and one 16-ton multi-zone VRF heat pumps; Trane/Mitsubishi, Daikin, or LG performance-equivalent systems.
Due
December 11, 2026
16 days left
Location
Hawaii
Posted on
hands.ehawaii.gov
Notice ID
IFB 26-27/P-56
Please quote replacement of the air conditioning system, including three outdoor heat pumps and eight indoor units, at the Iao Theater, 68 N. Market Street, Wailuku, Maui, Hawaii.
Outdoor equipment: Two 12-ton and one 16-ton multi-zone variable refrigerant flow heat pumps; Trane/Mitsubishi, Daikin, or LG performance-equivalent systems.
Indoor equipment: Two 4.5-ton, one 1-ton, one 2-ton, two 6-ton, and two 8-ton fan coil units; check capacities, airflow, connections, and existing conditions onsite.
Installation: Include removal, disposal, refrigerant recovery, ductwork, piping, controls, electrical connections, permits, startup, system testing, airflow balancing, training, and completion paperwork.
Schedule: Purchase equipment within 30 days of authorization to proceed; coordinate installation with roof replacement expected in July–December 2027 and finish within 270 calendar days of authorization, subject to approved extensions.
Warranty: Provide at least one year of parts and labor coverage.
License: Hold a current Hawaii C-52 or acceptable equivalent contractor license.
Please confirm availability and send your quote by December 11, 2026.
The original documents
Deadline: December 11, 2026
See the original on hands.ehawaii.gov
Bidding it yourself? Get the full package and submit on hands.ehawaii.gov before December 11, 2026.
What they need
Indoor equipmentEight fan coil units: two 4.5-ton, one 1-ton, one 2-ton, two 6-ton, and two 8-ton. Field verify capacities, airflow, connections, and existing conditions.
Complete installationInclude removal and disposal, refrigerant recovery, ductwork, piping, controls, electrical connections, permits, startup, commissioning, air balancing, training, and closeout documentation.
Procurement and storagePurchase equipment within 30 days of authorization to proceed. Quote secure, weather-protected storage separately at a monthly rate for eight months.
ScheduleCoordinate installation with roof replacement anticipated in Q3–Q4 2027; completion requirement is 270 calendar days from authorization to proceed, subject to approved extensions.
Separate alternatePrice design and installation of a complete backstage AC system, identifying system type, capacity, and electrical or structural requirements.
Pricing requirementsInclude applicable taxes, delivery, prevailing wages, and a minimum one-year parts and labor warranty. A current Hawaii C-52 or acceptable equivalent contractor license is required.
Other recent awards in this industry in Hawaii
Recent federal contract awards (federal buyers) in the same industry in Hawaii, from USAspending.gov. These are other jobs, not the same work as this one. Do not use them as a price guide for this job.
Who won
Amount
Buyer
Date
Wells Global, LLCIija funds. modernization, CO-location upgrade of EG-UPS power systems with NDP at oahu MT kaala, HI (QKA) ars…
$15,741
Federal Aviation Administration
Oct 2026
Dkn Electrical LLCTo provide electrical upgrade to insectary building and service hookup to new BSL-2 containerized laboratory t…
$71,549
Forest Service
Sep 2026
C.n.s. Communications, LLCSite survey travel, report and design for the DC bus demo baseline for hilo, HI (ITOB) RTR JCN
$19,409
Federal Aviation Administration
Sep 2026
Summit Fire & Security LLCTransport, hydrostatic testing, new bottle valves installed, system reinstallation, and testing - CGC hollyhoc…