XL Eagle Send us your price
California bid · open for prices

Air Conditioning Unit Replacement

Equipment: Supply and install one wall-mounted Bard 3-ton W36A1-A0ZXP4XXJ with low ambient control, one ICM492 control, and one RSH50 surge protective device, or equivalents.

Due
December 15, 2026
19 days left
Location
California
Posted on
sdbuynet.sandiegocounty.gov
Notice ID
13515

Please quote supply and installation of one wall-mounted Bard 3-ton air conditioning unit, or equivalent, with removal of the existing unit at the Lyons RCS radio site, 17421 Lyons Valley Road, Jamul, CA 91935.

  • Equipment: One wall-mounted Bard 3-ton W36A1-A0ZXP4XXJ with low ambient control, one ICM492 control, and one RSH50 surge protective device, or equivalents.
  • Installation: Remove and properly dispose of the existing unit; include mounting hardware, electrical whips, control wiring, supply/return metal transitions, sealing, connections, testing, and cleanup.
  • Schedule: Finish within 30 calendar days of agreement execution, Tuesday to Thursday, 7:00 AM to 4:00 PM Pacific, excluding holidays, with five business days' advance scheduling.
  • Site visit: Mandatory walkthrough December 8, 2026, at 11:00 AM PST; RSVP by December 4 at noon PST. Escorted access on narrow, unpaved roads; a high-clearance 4x4 is recommended.
  • Qualifications: Active California C-20 license; prevailing wage rates apply.
  • Warranty: Full manufacturer's warranty plus a one-year installation/labor warranty.

Please confirm availability and send your quote by December 15, 2026.

What it takes to win this job

Past winners charged $10,500 to $18,300 for jobs like this one.

Based on 5 past awards for the same kind of job.

To win it, you need

  • License: An active California C-20 license is required.
  • Mandatory walkthrough: Attend December 8, 2026, at 11:00 AM PST; RSVP by December 4 at noon PST.
  • Equipment: Supply Bard W36A1-A0ZXP4XXJ with low ambient control, ICM492 control, and RSH50 surge protection, or equivalents.
  • Quote requirements: Itemize equipment and labor, include all project costs except sales tax, and include a payment bond if the total is $25,000 or more.
  • Quote deadline: The document says to confirm availability and send a quote with equipment lead time by December 13, 2026; the posting lists December 15, 2026.

Past awards for the same work

Who wonTotalDate
Par-Con, INC.Mini split air conditioner replacement $18,266Jul 2026
J's Associates, LLCServer room air conditioning replacement $13,624Apr 2026
J's Associates, LLCElevator machine room air conditioning replacement $10,536Mar 2026
Critical Refrigeration Company LLCHazmat building air conditioner replacement $13,448Jul 2025
South Dade Air Conditioning & Refrigeration INCBasement split unit air conditioner replacement $10,599Jul 2024

Past prices come from public federal award records on USAspending.gov. State and local buyers do not post theirs in one place, so these are federal buys of the same work. Your price still has to cover your own costs.

The original documents

Deadline: December 15, 2026

See the original on sdbuynet.sandiegocounty.gov

Bidding it yourself? Get the full package and submit on sdbuynet.sandiegocounty.gov before December 15, 2026.

What they need

  • InstallationRemove and properly dispose of the existing unit; include mounting hardware, electrical whips, control wiring, supply/return metal transitions, sealing, connections, testing, and cleanup.
  • ScheduleComplete within 30 calendar days of agreement execution. Installation hours are Tuesday–Thursday, 7:00 AM–4:00 PM Pacific, excluding holidays, with five business days’ advance scheduling.
  • Site visitMandatory walkthrough December 8, 2026, at 11:00 AM PST; RSVP required by December 4 at noon PST. Access is escorted via narrow, unpaved roads; a high-clearance 4x4 is recommended.
  • Qualifications and warrantyActive California C-20 license; prevailing wage rates apply. Include the full manufacturer’s warranty and a one-year installation/labor warranty.
  • PricingItemize equipment and labor, include all project costs, and exclude sales tax. Include a payment bond if the total is $25,000 or more.

Similar open bids

Get new California bids by email

Save a search and we email you when a matching bid is posted. Free. Unsubscribe anytime.

More California bids → · Electrical bids in California → · HVAC bids in California → · All states →