This bid is for engineering design and CM/GC preconstruction support for a wastewater pump station replacement near 2700 South and 3800 West, on the east side of Bangerter Highway in West Valley City, Utah.
This bid has closed.
Buyers often post the same work again. Set an alert below and we will email you when a similar Utah bid is posted.
What the job is
Capacity: Approximately 212 GPM average flow and 276 GPM maximum flow; confirm through hydraulic evaluations and flow studies.
Investigations: Surveying, base mapping, geotechnical investigations, and subsurface utility research and potholing.
Design: Evaluate flooded suction, self-priming, and in-line configurations; prepare preliminary and final designs for the station, associated pipeline relocations and tie-ins, electrical service, standby power, controls, and SCADA.
Preconstruction support: Cost estimates, scheduling, constructability reviews, value engineering, and construction pricing review.
Continuity and schedule: Plan bypass pumping, sequencing, startup, and commissioning to keep the existing station operational until replacement; target completion by June 2028.
Qualifications: Utah-licensed PE project manager; project manager and team experience with at least three similar wastewater pump station projects and at least one UDOT coordination and CM/GC project.