Exterior: Replace most siding with horizontal MBCI MasterLine 16 corrugated metal and vertical MBCI Craftsman Series small-batten standing-seam metal, both in Desert Sand; Eldorado Stone Shadow Rock veneer in Teton.
This bid has closed.
Buyers often post the same work again. Set an alert below and we will email you when a similar Utah bid is posted.
What the job is
Interior: Framing, gypsum replacement, and flooring replacement using revised finish drawings A-201 and A-601.
Electrical and HVAC: Upgrade electrical systems and lighting; complete minor HVAC improvements.
Roofing: Patch the existing white membrane roof using a GAF-certified contractor; verify the membrane product before quoting.
Separate alternate: Remove museum carpet, grind and level the floor with self-leveler, and install new carpet.
Demolition coordination: Coordinate with owner-provided asbestos testing and removal for approximately 250 square feet of restroom ceiling texture and potentially affected door cores.
Completion: Substantial completion by May 30, 2027.