Sewage pumps: Remove and replace two pumps with Weil Model 2224 vertical sewage pumps, 4-inch discharge, 3 HP, 1750 RPM, three-phase tri-voltage motors; match existing hydraulic performance and verify the specified 9-foot basin depth.
Due
November 24, 2026
8 days left
Location
United States
Posted on
Bonfire
Notice ID
26-1493
Please quote replacement of sewage, sump, ejector, vacuum and condensate pumps and stations, including installation, in the basement at Jones High School, 700 S State St, Chicago, IL 60605.
Sewage pumps: Remove and replace two Weil Model 2224 vertical sewage pumps, 4-inch discharge, 3 HP, 1750 RPM, three-phase tri-voltage motors, matching existing hydraulic performance.
Pool and AHU #5: Replace the pool sump with a 3-inch duplex sump system and the AHU #5 ejector with a duplex vortex ejector system, both with 1 HP, 480V, three-phase pumps, panels, high-water alarms, floats, piping, valves and electrical reconnection.
Chiller room: Replace one effluent pump, float, alternator and check valve at the entrance.
Vacuum station: Replace the AHU #5 duplex vacuum station with two 2 HP air pumps, two 30 GPM water pumps and a 304 stainless steel tank.
Condensate stations: Replace two three-phase duplex stations with 304 stainless steel tanks: pool AHU and AHU #1, all pumps at 3450 RPM.
Installation: Include removal and disposal, piping and electrical reconnections, startup, testing and cleanup during normal working hours.
Please confirm availability and send your quote by November 24, 2026.
The original documents
Deadline: November 24, 2026
See the original on cps.bonfirehub.com
Bidding it yourself? Get the full package and submit on Bonfire before November 24, 2026.
What they need
Pool sump and AHU #5 ejector systemsReplace with a 3-inch duplex sump system and a duplex vortex ejector system, respectively; both with 1 HP, 480V, three-phase pumps. Include panels, high-water alarms, floats, discharge piping, check and gate valves, and electrical reconnection. Mount the pool panel above the pit.
Chiller room entranceReplace one effluent pump, float, alternator, and check valve.
AHU #5 vacuum stationReplace the duplex station, 208–230/460V, three-phase, 60 Hz, with 24V secondary; include two 2 HP air pumps rated 12.5 CFM at 5.5-inch vacuum, two water pumps rated 30 GPM at 20 PSI, and a 304 stainless steel tank. Field-verify the listed water pump rating of “3/4” before quoting.
Condensate stationsReplace two three-phase duplex stations with 304 stainless steel tanks: pool AHU station with a 24-gallon tank and two 1/3 HP pumps; AHU #1 station with two 1/2 HP pumps and two stainless steel suction isolation valves. All pumps: 3450 RPM.
Station controlsEach vacuum/condensate station requires a NEMA 1 mechanical alternator and NEMA 4/12 UL-listed panel with magnetic starters, lockable main disconnect, breakers, lighted HOA switches, and 115V control circuit.
InstallationInclude removal and disposal, piping and electrical reconnections, startup, testing, and cleanup during normal working hours. Field-verify dimensions and equipment requirements before quoting.
Mandatory walkthroughNovember 17, 2026, at 10:00 AM Chicago time; meet at the North Building Main Lobby.
Past history: who won Electrical work across the US
Recent federal contract awards (federal buyers) in the same industry across the US, from USAspending.gov. These are comparable jobs, not earlier rounds of this exact solicitation.
Typical award:$16K to $102Kmiddle half of 15 recent awards · median $30K