Boiler: Furnish and install one new Raypak H7-1104A MVB hydronic boiler in the existing outdoor location.
Removal: Isolate and drain the hydronic loop; disconnect, remove, and dispose of the existing boiler, flue vent, and debris.
Connections: Reuse suitable existing electrical, gas, and hydronic supply/return connections. Defective components will be addressed separately.
Vent and sensor: Install a new flue vent system and system temperature sensor at the outlet of the closely spaced tees, including necessary piping and fittings.
Commissioning: Refill and purge the loop, check leaks and operating pressure, and test boiler operation, temperature controls, sensor, and venting.
Installation: Licensed plumbing or mechanical contractor; include all labor, materials, equipment, and cleanup. Regular work hours are Monday–Friday, 7 a.m.–4 p.m. Central Time.
Site visit: Optional walkthrough October 14, 2026, at 10:30 a.m. Central Time; check in at Building 643.
The basics
Due
November 2, 2026 15 days left
Where
Texas
Posted on
Texas ESBD
Solicitation
HHS0018075
What the solicitation documents require
We read the solicitation documents for this bid (10 documents, 182 pages). Each item shows the file and page it came from. Check the original documents and any addenda before you bid.