This bid is to repair the east cooling tower’s chilled water return piping at Midwestern State University’s Central Plant, 3410 Taft Blvd, Wichita Falls, TX 76308.
Can you do this job? Tell us your price.
We write the bid, handle the paperwork, and submit it for you. No upfront fees.
Got it.
You send a priceOne number, before October 22, 2026.
We bid itXL Eagle submits the bid as the main contractor.
You do the workIf it is awarded, you do the job as our subcontractor.
Full replacement: Replace the basin manifold from within 2 feet of the north wall to the two flanged connections beneath the fans. Price three options separately: ASTM A53 Type E or F Schedule 40 carbon steel, 304 Schedule 10 stainless steel, and Schedule 80 PVC.
Limited replacement: Separately price replacing the 16-inch tee with Schedule 40 carbon steel from approximately 6 feet north of the tee to just beyond both 16-inch-to-12-inch transitions, subject to confirming the remaining pipe is sound.
Installation: Include an ASME Section IX certified welder for pipe and flange welding, replacement of flange hardware and seals, and all labor, materials, and travel. Plan for work while the tower is shut down from approximately November through February.
The basics
Due
October 22, 2026 4 days left
Where
Texas
Posted on
Texas ESBD
Solicitation
735-2026-4430
What the solicitation documents require
We read the solicitation documents for this bid (7 documents, 45 pages). Each item shows the file and page it came from. Check the original documents and any addenda before you bid.