Dam 1B: Clear both access drives to at least 12 feet wide and 10 feet high, including a fallen tree near the crest.
Dam 1B grading: Fill and regrade two access-drive sections about 60 by 12 feet, repair two toe erosion areas and four crest rut areas, compact fill, and direct lower-drive runoff away from the dam toe.
Dam 3A: Remove trees from the dam toe out at least 25 feet and clear woody growth along the auxiliary spillway fence, removing and reinstalling affected fencing.
Dam 5B: Remove trees along three fence lines and remove fallen trees and branches from the auxiliary spillway.
Stumps: Cut stumps close to ground level and treat them right away with Renovate containing triclopyr.
Debris: Leave Dam 1B trimmings at an approved on-site spot outside the easement; at Dams 3A and 5B, mulch small vegetation outside the easement and haul larger trees and branches off site.
Please confirm availability and send your quote by November 20, 2026.
The original documents
Deadline: November 20, 2026
See the original on scbo.sc.gov
Bidding it yourself? Get the full package and submit on scbo.sc.gov before November 20, 2026.
What they need
Dam 1B clearingClear both access drives to at least 12 feet wide and 10 feet high, including removal of a fallen tree near the crest.
Dam 1B gradingFill and regrade two access-drive sections, each approximately 60 feet long by 12 feet wide; repair two toe erosion areas, the largest approximately 6 by 8 feet; and repair four crest rut areas, the longest approximately 8 by 20 feet. Compact fill and direct lower-drive runoff away from the dam toe.
Dam 3ARemove trees from the dam toe extending at least 25 feet outward and clear woody vegetation along the auxiliary spillway fence. Remove and reinstall affected fencing, cut stumps close to ground level, and immediately treat with Renovate containing triclopyr.
Dam 5BRemove trees along three fence lines, immediately treat stumps with Renovate containing triclopyr, and remove fallen trees and branches from the auxiliary spillway.
Debris handlingLeave Dam 1B trimmings at an approved on-site location outside the easement. At Dams 3A and 5B, mulch smaller vegetation outside the easement and haul larger trees and branches to an approved off-site location.
RestorationSeed and mulch all disturbed areas, approximately 0.75 acre, including agricultural lime, fertilizer, and the specified fescue, Bermuda, and rye grain mix.
Past history: who won Landscaping & Grounds work in South Carolina
Recent federal contract awards (federal buyers) in the same industry in South Carolina, from USAspending.gov. These are comparable jobs, not earlier rounds of this exact solicitation.
Typical award:$13K to $178Kmiddle half of 15 recent awards · median $29K