XL Eagle Send us your price
North Carolina bid · open for prices

Lawn Care Services

This bid is for lawn care and seasonal services at C. A. Dillion Youth Development Center, 100 Dillion Drive, Butner, NC 27509.

Due
November 23, 2026
11 days left
Location
Butner, NC
North Carolina
Posted on
evp.nc.gov
Notice ID
19-IFB-2471718543-HDE

Please quote lawn care and seasonal services for one year at C. A. Dillion Youth Development Center, 100 Dillion Drive, Butner, NC 27509.

  • Routine: About 25 acres, an estimated 52 weekly visits a year; mow to 3 inches, trim and edge beds and paved areas, clear clippings, remove leaves and pinecones, and clear storm drains.
  • Initial cleanup: Mowing, fence-line leaf removal, hillside cutting near the maintenance shop, and fence-line bush hogging; the pricing sheet lists 87.11 acres, to be verified at the site visit.
  • Additional: Quote separately for bush hogging 6 to 8 feet outside the fence and along the sewer line, herbicide brush control, tree trimming to 16 feet, and snow removal with sidewalk shoveling and ice melt as needed.
  • Restrictions: No spraying around housing areas or on ballfield slopes.
  • Term: One year, with all labor, equipment, supplies and transportation included; services are as needed and not guaranteed.
  • Access: Visits between 6:30 a.m. and 4 p.m.; crew background checks required.

Please confirm availability and send your quote by November 23, 2026.

The original documents

Deadline: November 23, 2026

See the original on evp.nc.gov

Bidding it yourself? Get the full package and submit on evp.nc.gov before November 23, 2026.

What they need

  • Routine maintenanceApproximately 25 acres, estimated 52 weekly visits annually; mow to 3 inches, trim and edge beds and paved areas, clear clippings, remove leaves and pinecones, and clear storm drains.
  • Initial cleanupMowing, fence-line leaf removal, hillside cutting near the maintenance shop, and fence-line bush hogging. The pricing sheet lists 87.11 acres for initial cleanup; please verify the area during the site visit.
  • Additional servicesQuote separately for bush hogging 6–8 feet outside the fence and along the sewer line, herbicide brush control, tree trimming to 16 feet, and snow removal with sidewalk shoveling and ice melt as needed. No spraying around housing areas or on ballfield slopes.
  • Service term and accessOne year; include all labor, equipment, supplies, and transportation. Coordinate visits within 6:30 a.m.–4 p.m.; crew background checks required. Services are requested as needed and are not guaranteed.
  • Site visitMandatory attendance on November 16, 2026, at 10:00 a.m. Eastern at the address above.

Past history: who won Paving & Concrete work in North Carolina

Recent federal contract awards (federal buyers) in the same industry in North Carolina, from USAspending.gov. These are comparable jobs, not earlier rounds of this exact solicitation.

Typical award: $492K to $8Mmiddle half of 15 recent awards · median $2.7M
Who wonAmountBuyerDate
Williams Construction & Cabinetry, INC.Uwharrie OHV trail maintenance $129,574Forest ServiceSep 2026
Terra Site Constructors LLCCarl-repair equipment storage shed $263,137National Park ServiceSep 2026
Parliament LLCEO 14398 construction, replace planks and repair pilings at bodie island lighthouse boardwalk and observation … $337,480National Park ServiceSep 2026
Cape Romain Contractors, INCAtlantic intracoastal waterway (aiww) snows CUT shoreline erosion bank stabilization $7,015,897Department of the ArmyJul 2026
Worrell Contracting CO INC925 FY26 ncota national shrine project - raise-realign-reset, clean upright headstones & renovate turf with so… $1,025,731Department of Veterans AffairsMay 2026
Solid Venture Contractors, LLCSF-00010-25D sotf drainage repair package D, fort bragg, NC $2,318,647Department of the ArmyMay 2026
Southern Taproot LLCRepair and restoration of cloudland trail on the appalachian ranger district. this trail WAS heavily impacted … $299,178Forest ServiceApr 2026
Three Oaks Construction, INCThe work includes the repair and improvement of four atlantic intracoastal waterway (aiww) upland placement ar… $5,962,000Department of the ArmyApr 2026

Losing bids are not made public on most government buys, so only the winner and price are shown.

Similar open bids

Get new North Carolina bids by email

Save a search and we email you when a matching bid is posted. Free. Unsubscribe anytime.

More North Carolina bids → · Paving & Concrete bids in North Carolina → · Landscaping & Grounds bids in North Carolina → · Fencing bids in North Carolina → · Plumbing bids in North Carolina → · All states →