Equipment: One 30-ton and one 35-ton packaged rooftop unit with DX cooling, natural gas heat, factory-installed economizers and power exhaust; Trane, Carrier, or approved equal. Verify compatibility with existing electrical supply.
Due
December 1, 2026
16 days left
Location
Oregon
Posted on
OregonBuys
Notice ID
S-KS0043-00018294
Please quote replacement of two packaged rooftop HVAC units, one 30-ton and one 35-ton, including removal of the old equipment, at CC Media, 575 Trade Street, Salem, OR 97301 and the IT offices, 295 Church Street SE, Salem, OR 97301.
Equipment: One 30-ton and one 35-ton packaged rooftop unit with DX cooling, natural gas heat, factory-installed economizers and power exhaust; Trane, Carrier, or approved equal.
Installation: Remove and dispose of existing equipment; include curbs/adapters, duct transitions, electrical modifications, condensate connections, and watertight roof work that preserves existing roof warranties.
Controls: Provide Automated Logic BAS-compatible interface hardware and accessible termination points; BAS field wiring and programming are done by others.
Fire alarm: Duct smoke detectors, connections to the existing fire alarm system, shutdown interlocks, and acceptance testing.
Testing: Startup, commissioning, air balancing with final report, operating manuals, and a written roofing warranty.
Please confirm availability and send your quote by December 1, 2026.
The original documents
Deadline: December 1, 2026
See the original on oregonbuys.gov
Bidding it yourself? Get the full package and submit on OregonBuys before December 1, 2026.
What they need
InstallationRemove and dispose of existing equipment; include curbs/adapters, duct transitions, electrical modifications, condensate connections, and watertight roof work preserving existing roof warranties.
ControlsProvide Automated Logic BAS-compatible interface hardware and accessible termination points. BAS field wiring and programming are by others.
Fire alarmInclude duct smoke detectors, existing fire alarm system connections, shutdown interlocks, and acceptance testing.
Testing and warrantyInclude startup, commissioning, air balancing with final report, operating manuals, minimum one-year labor warranty, manufacturer warranties, and written roofing warranty.
ScheduleComplete within 90 calendar days of authorization to proceed; work hours are Monday–Friday, 7:30 AM–4:00 PM.
Past history: who won Electrical work in Oregon
Recent federal contract awards (federal buyers) in the same industry in Oregon, from USAspending.gov. These are comparable jobs, not earlier rounds of this exact solicitation.
Typical award:$14K to $49Kmiddle half of 15 recent awards · median $36K