XL Eagle Send us your price
Missouri bid · open for prices

Wastewater Treatment Boiler Rebuild

Retube: Retube one Superior boiler with 48 straight code boiler tubes, 2.5-inch x 144-inch. Remove existing tubes, clean and inspect tube sheets/holes, remove scale and debris, and dispose of waste offsite.

Due
November 12, 2026
4 days left
Location
Joseph, MO
Missouri
Posted on
Ionwave
Notice ID
RFP2027-22

Please quote rebuilding one boiler at the Water Protection Facility, 3500 759 Highway, St. Joseph, Missouri, including all labor, materials, and equipment.

  • Tubes: Replace 48 straight boiler tubes, 2.5 inches by 144 inches, in one Superior boiler; clean and inspect tube sheets and holes, remove scale and debris, and dispose of waste offsite.
  • Assembly: Secure tubes to factory specifications, seal-weld the rear section to ASME standards, replace access-opening gaskets, and fill with water to check for leaks.
  • Insulation: Replace damaged door insulation with 1-inch insuboard, pins, and clips; reuse existing heat-resistant lining where possible.
  • Burner: Supply and install an Oilon GP-50 or comparable burner with a 10:1 output range, linkageless modulating controls, a new gas supply assembly and valves, and an internal PID controller.
  • Installation: Include demolition, piping, electrical connections, a fabricated mounting plate, burner-head insulation, startup, and operator training.
  • Plumbing: Install continuous-operation recirculation piping, a chemical injection system, and a water meter connected to the injection system.

Please confirm availability and send your quote by November 12, 2026.

The original documents

Deadline: November 12, 2026

  • Request for Proposal - Wastewater Treatement Boiler Rebuild RFP2027-22.pdf PDF · 3 pages
  • W-9 Form.pdf PDF · 4 pages
  • Wage Order 33 6.11.26.pdf PDF · 4 pages
  • Request for Proposal - Wastewater Treatement Boiler Rebuild RFP2027-22.pdf PDF · 3 pages
  • W-9 Form.pdf PDF · 4 pages
  • Wage Order 33 6.11.26.pdf PDF · 4 pages

See the original on stjosephmo.ionwave.net

Bidding it yourself? Get the full package and submit on Ionwave before November 12, 2026.

What they need

  • Assembly and testingTorque-roll tubes to factory specifications, ASME seal-weld the rear pass, replace handhole/manway gaskets, and fill with water to check for leaks.
  • InsulationReplace damaged door insulation with 1-inch insuboard, pins, and clips; reuse existing refractory where possible.
  • Burner retrofitSupply and install an Oilon GP-50 or comparable burner with 10:1 turndown, linkageless modulating controls, new gas train and valves, and internal PID controller. Include demolition, piping, electrical connections, fabricated mounting plate, burner-head insulation, startup, and operator training.
  • PlumbingInstall continuous-operation recirculation piping, a chemical injection system, and a water meter integrated with the injection system.
  • Optional water softenerProvide separate pricing for supply and installation.

What you have to submit

Pulled from the 6 solicitation documents (22 pages). Each item links to the page it came from. Check the originals and any amendments before you bid.

1How and where to submit

2Deadline

3Forms to fill out

4Site visit

5Pricing format

Past history: who won Construction & Renovation work in Missouri

Recent federal contract awards (federal buyers) in the same industry in Missouri, from USAspending.gov. These are comparable jobs, not earlier rounds of this exact solicitation.

Typical award: $190K to $1.5Mmiddle half of 14 recent awards · median $439K
Who wonAmountBuyerDate
Defender Contracting & Construction 2, LLCReplace the water service line, steam supply line, and steam condensate line for B2014 $447,649Department of the Air ForceNov 2026
Sce, INC.Gaoa council bluff beach access bridges 1 & 2 replacement $431,068Forest ServiceNov 2026
Hof Construction INCDepartment of defense, office of inspector general attorney's space build OUT eagleton courthouse, saint louis… $80,000Public Buildings ServiceOct 2026
Haggards Excavating LLCMo-neosho nfh-mixing BOX emerg repairs $20,000Departmental OfficesOct 2026
Bkm Construction LLCHHS office buildout on the 18TH floor of bolling fb., 601 E. 12TH ST, kansas city, missouri 64106 $155,948Public Buildings ServiceOct 2026
Guarantee Interiors, INC.657-23-104JC - prepare site for NEW computed tomography, unit room A259 $1,479,588Department of Veterans AffairsOct 2026
Adbc-Fsc Joint Venture LLC589-21-211, renovate building 26 for pharmacy, phlebotomy, and police department $6,681,370Department of Veterans AffairsOct 2026
Onsite Construction Group LLC589-26-355, correct miscellaneous electrical deficiencies $345,626Department of Veterans AffairsOct 2026

Losing bids are not made public on most government buys, so only the winner and price are shown.

Similar open bids

Get new Missouri bids by email

Save a search and we email you when a matching bid is posted. Free. Unsubscribe anytime.

More Missouri bids → · Construction & Renovation bids in Missouri → · Electrical bids in Missouri → · HVAC bids in Missouri → · Plumbing bids in Missouri → · Water & Wastewater bids in Missouri → · All states →