Static lane closures: 300 days; include cones, service trucks, and at least two personnel remaining onsite. Quote protective truck-mounted attenuators separately.
Due
November 24, 2026
9 days left
Location
Massachusetts
Posted on
COMMBUYS
Notice ID
BD-27-1030-0H100-0H002-135011
Please quote scheduled and emergency traffic management, including lane closures, mobile operations, signing, drums, lighting and flaggers, at various highway and roadway locations throughout District 5, Massachusetts, excluding the islands.
Static closures: 300 days with cones, service trucks, and at least two personnel onsite; quote protective truck-mounted attenuators separately.
Mobile operations: 70 days with cones, service trucks, personnel, and two truck-mounted attenuators with combination arrow boards/message signs.
Equipment: 325 attenuator days, 325 Type C arrow board days, 120 portable changeable message sign days, and 800 square feet of safety signing.
Drums and strips: 2,000 reflectorized drum days, 300 days of 10-drum groups with sequential flashing lights, and 72 days of three-piece portable rumble strip arrays.
Lighting and flaggers: 30 days of balloon-style diffused work-zone lighting mounted at least 12 feet high, and 50 roadway flagger hours.
Service: Furnish, deploy, maintain, reposition, and remove devices; scheduled work starts within 48 hours of notice or at the assigned time; emergency response may be needed at any time; night shifts generally 9 p.m. to 5 a.m.
Please confirm availability and send your quote by November 24, 2026.
The original documents
Deadline: November 24, 2026
See the original on www.commbuys.com
Bidding it yourself? Get the full package and submit on COMMBUYS before November 24, 2026.
What they need
Mobile operations70 days; include cones, service trucks, personnel, and two truck-mounted attenuators with combination arrow boards/message signs.
Additional equipment325 attenuator days, 325 Type C arrow board days, 120 portable changeable message sign days, and 800 square feet of safety signing.
Drums and rumble strips2,000 reflectorized drum days, 300 days for groups of 10 drums with sequential flashing lights, and 72 days for arrays of three portable rumble strips.
Lighting and flaggers30 days of balloon-style diffused work-zone lighting, mounted at least 12 feet high, and 50 roadway flagger hours.
Service requirementsFurnish, deploy, maintain, reposition, and remove devices as needed. Scheduled work starts within 48 hours of notice or at the assigned time; emergency response may be required at any time. Night shifts are generally 9 p.m.–5 a.m.
PricingProvide unit rates reflecting applicable prevailing wages. Static and mobile operations use an eight-hour day with a four-hour minimum.