This bid is for bridge drift debris removal at Pumpkinvine Creek, SR 3 southbound, milepost 1.035, Bartow County, Georgia (34.090608, -84.739645).
This bid has closed.
Buyers often post the same work again. Set an alert below and we will email you when a similar Georgia bid is posted.
What the job is
Scope: Remove all accumulated drift from the bridge substructure; verify debris quantities on-site before quoting a fixed lump sum.
Removal method: Hoist debris using cables or ropes from the bridge deck or road surface. Do not drag debris across the streambed or allow equipment to contact it. A crane on the bridge deck requires an approved detailed plan.
Disposal: Haul debris off-site to a permitted solid waste facility or inert waste landfill; include cleanup.
Traffic control: Include labor, equipment, permits, and traffic control, maintaining at least 11 feet of roadway for traffic without obstructing traffic flow.
Schedule: Begin within 30 days of the prework meeting, reach 50% completion by day 75, and finish by day 120.