This bid is for engineering design services for a new pedestrian and bicycle bridge over I-20 along Factory Shoals Road, from Hartman Road to Riverside Parkway in Cobb County, Georgia.
Can you do this job? Tell us your price.
We write the bid, handle the paperwork, and submit it for you. No upfront fees.
Got it.
You send a priceOne number, before November 12, 2026.
We bid itXL Eagle submits the bid as the main contractor.
You do the workIf it is awarded, you do the job as our subcontractor.
Bridge: Design a new bridge adjacent to the existing roadway bridge, with a 12-foot shared-use path and a 2-foot barrier on each side, including connecting paths.
Design: Concept development with two alignment alternatives, preliminary and final bridge and roadway plans, right-of-way plans, utility plans, drainage, signing, marking, and erosion control.
Studies: Field surveys, environmental documentation and studies, geotechnical and bridge foundation investigations, and hydraulic and hydrological analysis.
Support: Public involvement, cost estimates, construction questions, plan revisions, and shop drawing reviews.
The basics
Due
November 12, 2026 25 days left
Where
Georgia
Posted on
ssl.doas.state.ga.us
Solicitation
PE-77050-NONST-2027-000000111
What the solicitation documents require
We read the solicitation documents for this bid (1 document, 32 pages). Each item shows the file and page it came from. Check the original documents and any addenda before you bid.
Submit through the County's eProcurement portal (OpenGov, procurement.opengov.com/portal/cobbcoga) as a single PDF. Do not deliver to the Cobb DOT office. (B2464 Factory Shoals Ped Bridge _ RFQ.pdf, p. 13)
The team (prime and/or sub-consultants) must be prequalified by GDOT in the listed area classes, such as 1.06(a) NEPA Documentation, 5.01 Land Surveying and 9.01 ESPCP. (B2464 Factory Shoals Ped Bridge _ RFQ.pdf, p. 3)
Concept development, including kickoff and monthly progress meetings, a Project Justification Statement and a Concept Report for the Factory Shoals Ped Bridge. (B2464 Factory Shoals Ped Bridge _ RFQ.pdf, p. 20)
Preliminary and final construction plans, signing and marking plans, erosion control plans, and final right-of-way plans, including revisions. (B2464 Factory Shoals Ped Bridge _ RFQ.pdf, p. 20)