Preliminary engineering: Preliminary design and a draft Preliminary Engineering Report due January 4, 2027.
Additional services: Design and construction management if project funding is secured.
Qualifications: Georgia engineering licensure, experience with similar street and drainage projects, and Errors and Omissions insurance.
Pricing: Provide separate fees or percentages for preliminary engineering and subsequent design and construction management.
The basics
Due
November 10, 2026 23 days left
Where
Georgia
Posted on
ssl.doas.state.ga.us
Solicitation
PE-64500-NONST-2027-000000021
What the solicitation documents require
We read the solicitation documents for this bid (2 documents, 2 pages). Each item shows the file and page it came from. Check the original documents and any addenda before you bid.
Submit questions, Statement of Qualifications, and proposal packages to Bethany Newby, 5405 Oak Street, Eastman, GA 31023, or BNEWBY@HOGARC.ORG. (Notice for RFP 2027 CDBG Dodge County.pdf, p. 1)
Submit fees and/or percentages for the Preliminary Engineering Report and for Design and Construction Management Services if funded. The draft PER is due by January 4, 2027. (Notice for RFP 2027 CDBG Dodge County.pdf, p. 1)
Proposal must cover firm history, CDBG/EIP/RDF experience, key personnel, current workload, proposed scope and level of service, similar projects and references. (Notice for RFP 2027 CDBG Dodge County.pdf, p. 1)