This bid is to remove existing CCN controls and install a BACnet building management system at 65 Billy B. Hair, Savannah, GA 31408.
This bid has closed.
Buyers often post the same work again. Set an alert below and we will email you when a similar Georgia bid is posted.
What the job is
Server and integration: i-Vu Pro software, panel-mounted server and license, communications modules, and a BACnet integration panel with Compact Link, transformer, and enclosure.
Terminal units: Controls for approximately 18 VAV/PIU units, including BACnet controllers, temperature sensors, transformers, and applicable heat and fan controls.
Air handling unit: BACnet controls for a variable air volume DX unit, including VFD control, fan and filter status, pressure and temperature sensors, humidity monitoring, and outside/return air damper actuators.
Connections: Network connections for devices requiring Ethernet.