The original documents
Deadline: November 30, 2026
See the original on ssl.doas.state.ga.us
Bidding it yourself? Get the full package and submit on ssl.doas.state.ga.us before November 30, 2026.
What they need
- Rental term10 months; please provide monthly pricing.
- UPSOne Vertiv Liebert eXM, model 51SA150HAA00594, or equivalent; 150kVA/150kW with 480VAC input/output, three-phase, 3-wire plus ground.
- Maintenance bypassMatching cabinet, Vertiv model 51MBH33AA0R1229 or equivalent.
- Battery cabinetsTwo compatible cabinets, each with a 600A circuit breaker, providing approximately 10 minutes of runtime at a 150kW load.
- StartupInclude UPS system startup. External cabling installation will be provided by others.
Get new Georgia bids by email
Save a search and we email you when a matching bid is posted. Free. Unsubscribe anytime.
More Georgia bids → · All states →