This bid is for plant establishment and erosion control along Route 76 in Oceanside, San Diego County, California, from Melrose Drive to 0.1 miles east of Gird Drive.
Can you do this job? Tell us your price.
We write the bid, handle the paperwork, and submit it for you. No upfront fees.
Got it.
You send a priceOne number, before October 30, 2026.
We bid itXL Eagle submits the bid as the main contractor.
You do the workIf it is awarded, you do the job as our subcontractor.
Plant establishment: Type 1 establishment, seasonal watering, weed disposal, pest control, and site upkeep; complete within 500 working days.
Erosion control: Dry seed, hydromulch, and hydroseed, each covering 102,611 square feet; include two mobilizations. Apply Type 1 hydroseed between October 1 and January 31.
Irrigation: Check and test existing facilities, including leaks, components, electrical continuity, and controller communications.
Site protection: Include 72 temporary drainage inlet protections, site management, and water pollution control.
Traffic control: Include eight construction area signs, a traffic control system, and 34 vehicle-days of stationary impact attenuator coverage; provide bicycle flagging and escorts during shoulder closures.