Removal and installation: Remove and dispose of two half-swing doors; furnish and install two full-height, lockable solid-core wood doors with glass vision lites, hollow-metal frames, and hardware. Field-verify conditions and dimensions before pricing.
Due
November 24, 2026
16 days left
Location
California
Posted on
OpenGov
Notice ID
26-097-ITB
Please quote replacement of two interior doors at the second-floor permitting counter at City Hall, 1110 West Capitol Avenue, West Sacramento, CA 95691.
Doors: Remove and dispose of two half-swing doors; install full-height, lockable solid-core wood doors with glass vision lites, hollow-metal frames, and hardware.
Accessibility: Main door needs a 36-inch door panel, 32-inch clear opening, accessible lever hardware, safety glass, and free exit; both doors must clear carpet without sweeps.
Access control: Include electric strike and door-position switch preparation, electrified hardware, a power transfer path, and conduit with pull string; coordinate with the separate installer before fabrication.
Options: Price full-glass vision lites for both doors with a solid bottom 10 inches on the push side, and any needed partition framing, drywall, and finishing, separately.
Site work: Verify conditions and dimensions before pricing; protect finishes, patch and refinish to match, remove debris, and include permits and inspections.
Requirements: Meet California Building Code, pay prevailing wages, and finish within 30 working days of authorization to start.
Please confirm availability and send your quote by November 24, 2026.
The original documents
Deadline: November 24, 2026
See the original on procurement.opengov.com
Bidding it yourself? Get the full package and submit on OpenGov before November 24, 2026.
What they need
Accessible entranceMain door requires a 36-inch leaf, 32-inch clear opening, accessible lever hardware, safety glazing, and free exit. Undercut both doors to clear carpet; no sweeps over carpet.
Access control preparationInclude main-door electric strike and position-switch preparation, electrified hardware, power transfer path, and conduit/raceway with pull string. Coordinate with the separate access-control installer before fabrication.
Separate optionsPrice full-glass vision lites for both doors, retaining a solid bottom 10 inches on the push side, and any needed partition framing, drywall, and finishing.
Finishing and permitsProtect adjacent finishes, patch and refinish affected surfaces to match, remove debris, and include permits and inspections. Work must meet California Building Code; prevailing wages apply.
ScheduleComplete within 30 working days of authorization to start.
Past history: who won Welding, Fabrication & Machining work in California
Recent federal contract awards (federal buyers) in the same industry in California, from USAspending.gov. These are comparable jobs, not earlier rounds of this exact solicitation.
Typical award:$273 to $469middle half of 15 recent awards · median $390