Fixtures: Replace 13 toilets and 5 urinals with commercial-grade stainless steel fixtures; install 12 sinks with faucets and replace associated valves and plumbing components.
Can you do this job? Tell us your price.
We write the bid, handle the paperwork, and submit it for you. No upfront fees.
Got it.
You send a priceOne number, before November 30, 2026.
We bid itXL Eagle submits the bid as the main contractor.
You do the workIf it is awarded, you do the job as our subcontractor.
Partitions and accessories: Install stainless steel partitions and countertops, privacy panels, ADA grab bars, soap dispensers, non-rolling toilet paper holders, waste receptacles, and hand dryers.
Finishes and repairs: Remove existing fixtures and finishes as needed; repair walls, ceilings, and structural damage; paint surfaces and repair or refinish durable, slip-resistant flooring.
Electrical and doors: Install LED lighting, replace switches and sensors as needed, and repair or replace doors and hardware to meet accessibility and code requirements.
Project costs: Include labor, materials, equipment, permits, utility locates, site protection, temporary restrooms, disposal, and final cleaning. Provide separate subtotals for the 4-plex, 3-plex, and restroom behind the office, with applicable taxes and a separate 10% contingency.
Site meeting: Mandatory walkthrough on November 4, 2026, at 9:00 a.m. Arizona time at the address above.