This bid is for HVAC engineering design services for the Headquarters Building at 260 West Seeboth Street and Laboratory Building at 250 West Seeboth Street, Milwaukee, WI 53204.
This bid has closed.
Buyers often post the same work again. Set an alert below and we will email you when a similar Wisconsin bid is posted.
What the job is
Assessment: Evaluate each building separately, including the laboratory skywalk, with field investigations, certified airflow testing, load calculations, and separate Basis of Design reports.
Design: Prepare 30%, 60%, 90%, and final signed and sealed HVAC replacement documents, cost estimates, and permit packages. Include related electrical, structural, architectural, utility, and Honeywell Tridium Niagara BAS modifications.
Operational continuity: Develop construction phasing, temporary HVAC, and outage plans to maintain continuous BSL-2 laboratory operations and protect sensitive equipment.
Support: Include project management, bid support, construction engineering support, record drawings, O&M manuals, and HVAC/BAS staff training.
Commissioning: Include a $50,000 allowance and a currently certified HVAC commissioning lead.
Schedule and qualifications: Work under a Wisconsin-registered Professional Engineer; anticipated start February 8, 2027, with design completed within 12 months.