Equipment: Replace one split-system AC condensing unit and the existing indoor air handler’s DX cooling coil with new, like-kind equipment.
Due
November 17, 2026
18 days left
Location
Washington
Posted on
Bonfire
Notice ID
C2026-0233
What they need
InstallationInclude removal, refrigerant recovery, associated refrigerant piping and insulation, condensate drainage, electrical connections, vibration isolation, and seismic supports.
ControlsProvide Siemens Building Technologies DDC controls, integrated with the existing system; no substitutions.
StartupInclude testing, balancing, commissioning, operating manuals, and staff training.
ScheduleComplete within 210 calendar days of authorization to proceed, including 180 days for preconstruction and procurement and 30 days for demolition and construction. Building remains occupied; utility shutdowns limited to four hours.
Site visitMandatory walkthrough on November 4, 2026, at 2:00 p.m. local time at the project address.