This bid is for architectural, engineering, and pre-development services for the Joe Rantz Youth Housing and Family Resource Center in Sequim, Clallam County, Washington.
Due
November 13, 2026
5 days left
Location
Clallam County, WA
Washington
Posted on
pr-webs-vendor.des.wa.gov
Please quote architectural, engineering, and pre-development services for the Joe Rantz Youth Housing and Family Resource Center in Sequim, Clallam County, Washington.
Size: Approximately 50,000–70,000 square feet on 2–6 acres for approximately 38 residential youth, with a family resource center and medical and dental suites.
Planning: Confirm program needs, map space needs, assess site suitability or prototype plans, and prepare initial site plans, floor plans, and campus layout options.
Design: Design spaces that account for trauma, separate public and youth residential access, review licensing and building rules, and assess engineering systems together.
Phasing: Prepare an early construction budget estimate, assess value, and plan construction in phases.
Sustainability: Plan for LEED Silver environmental certification and assess extra requirements and costs for LEED Gold.
Schedule: Anticipated start November 20, 2026; final package due March 20, 2027.
Please confirm availability and send your quote by November 13, 2026.
The original documents
Deadline: November 13, 2026
See the original on pr-webs-vendor.des.wa.gov
Bidding it yourself? Get the full package and submit on pr-webs-vendor.des.wa.gov before November 13, 2026.
What they need
Project sizeApproximately 50,000–70,000 square feet on 2–6 acres, serving approximately 38 residential youth alongside a family resource center with medical/dental suites.
Planning and designProgram validation, space matrix, site feasibility or prototype planning, conceptual site and floor plans, and campus layout options.
Design requirementsTrauma-informed spaces, separate public and private youth residential access, preliminary licensing/code review, and coordinated engineering systems assessment.
Cost and phasingPlanning-level capital estimate, value analysis, and phased implementation strategy, considering a preliminary $29.6M–$44.25M capital budget.
SustainabilityLEED Silver roadmap with an assessment of incremental requirements and costs for LEED Gold.
Schedule and pricingAnticipated start November 20, 2026; final package due March 20, 2027. Include a fixed fee or not-to-exceed amount, assumptions, exclusions, and separately priced optional services.