Circuits: Two independent 20 Gbps committed, symmetrical, full-duplex circuits, each delivered on one 100GE handoff.
Due
January 4, 2027
38 days left
Location
Virginia
Posted on
mvendor.cgieva.com
Notice ID
RFP-132253
Please quote two independent 20 Gbps dedicated Internet access circuits for two data centers at 12511 Warwick Blvd, Suite A, Newport News, VA 23606, and 12580 Patrick Henry Drive, Newport News, VA 23602.
Circuits: Two independent 20 Gbps committed, symmetrical, full-duplex circuits, each delivered on one 100GE handoff.
IP addressing: One shared /24 public IPv4 block and one /31 subnet per circuit, with BGP peering and support for customer-assigned address advertisements.
Reliability: Physically diverse routes where available, separate edge routers and points of presence, and two redundant upstream providers. Shared infrastructure must be disclosed.
Support: At least 99.9% monthly availability per circuit, 24/7/365 engineering support, monitoring, and bandwidth utilization reporting. Include your SLA.
Schedule: Installation and testing completed by July 1, 2027.
Term: Three-year service term with two optional one-year extensions.
Please confirm availability and send your quote by January 4, 2027.
What it takes to win this job
No close past price for this exact job. Past awards for this kind of work were too far apart in size and price to give one fair number.
Price it from your own costs. Ask the buyer who does this work now and what they pay.
To win it, you need
Circuit requirements: Provide two independent 20 Gbps committed, symmetrical, full-duplex circuits, each with one 100GE handoff.
IP addressing: Provide one shared /24 public IPv4 block and one /31 subnet per circuit, with BGP peering and customer-assigned address advertisements.
Reliability: Use physically diverse routes where available, separate edge routers and points of presence, and two redundant upstream providers; disclose shared infrastructure.
Support: Include an SLA with at least 99.9% monthly availability per circuit, 24/7/365 engineering support, monitoring, and bandwidth utilization reporting.
Schedule and pricing: Complete installation and testing by July 1, 2027, and itemize circuit, IP, equipment, installation, and construction charges for three years, pricing the two optional one-year extensions separately.
The original documents
Deadline: January 4, 2027
See the original on mvendor.cgieva.com
Bidding it yourself? Get the full package and submit on mvendor.cgieva.com before January 4, 2027.
What they need
IP addressingOne shared /24 public IPv4 block and one /31 subnet per circuit, with BGP peering and support for customer-assigned address advertisements.
ReliabilityPhysically diverse routes where available, separate edge routers and points of presence, and two redundant upstream providers. Disclose shared infrastructure.
SupportMinimum 99.9% monthly availability per circuit, 24/7/365 engineering support, monitoring, and bandwidth utilization reporting. Include your SLA.
ScheduleInstallation and testing completed by July 1, 2027, for a three-year service term with two optional one-year extensions.
PricingItemize monthly charges per circuit, IP addressing, equipment, installation, and any construction costs. Price extension years separately; optional bandwidth pricing at 10 Gbps and 30–100 Gbps in 10 Gbps increments is welcome.
Other recent awards in this industry in Virginia
Recent federal contract awards (federal buyers) in the same industry in Virginia, from USAspending.gov. These are other jobs, not the same work as this one. Do not use them as a price guide for this job.
Who won
Amount
Buyer
Date
Doyon Technical Services, LLCProvide and install all material and labor necessary to demo failed CMP, and RE-install RCP. - design, demolis…