This bid is for dedicated fiber internet service at Bill and Hillary Clinton National Airport, 1 Airport Road, Little Rock, AR 72202-4489.
Due
December 17, 2026
21 days left
Location
Little Rock, AR
Arkansas
Posted on
vendors.planetbids.com
Notice ID
26004RFP
Please quote dedicated 10 Gbps fiber internet service with a managed router for Bill and Hillary Clinton National Airport, 1 Airport Road, Little Rock, AR 72202-4489.
Bandwidth: Minimum 10 Gbps dedicated symmetrical, unlimited data, no bursting, throttling, or traffic shaping.
IP addresses: At least 32 static IPv4 addresses and one static IPv6 /56 subnet.
Router: Managed full-bandwidth router with redundant power supplies, configurable SIP ALG, monitoring, maintenance, security updates, and hardware replacement.
Reliability: Minimum 99.9% monthly availability, a service agreement with response and restoration commitments and service credits, 24/7 technical support, and on-site help as needed.
Installation: Includes fiber construction, installation, integration, and testing, with substantial completion targeted within 150 calendar days of authorization to proceed.
Term: Five-year service term, with optional sixth-year pricing.
Please confirm availability and send your quote by December 17, 2026.
The original documents
Deadline: December 17, 2026
See the original on vendors.planetbids.com
Bidding it yourself? Get the full package and submit on vendors.planetbids.com before December 17, 2026.
What they need
ConnectivityMinimum 10 Gbps dedicated symmetrical bandwidth, with unlimited data and no bursting, throttling, or traffic shaping.
IP addressesAt least 32 static IPv4 addresses and one static IPv6 /56 subnet.
Managed routerFull-bandwidth equipment with redundant power supplies, configurable SIP ALG, monitoring, maintenance, security updates, and hardware replacement.
Reliability and supportMinimum 99.9% monthly availability, an SLA with response/restoration commitments and service credits, 24/7 technical support, and on-site assistance as needed.
InstallationInclude required fiber construction, installation, integration, and testing; identify the proposed route and lead time. Target substantial completion within 150 calendar days of authorization to proceed.
PricingQuote a five-year service term, separating one-time construction/installation costs from all-inclusive monthly charges, with a cost breakdown and optional sixth-year pricing.
Other recent awards in this industry in Arkansas
Recent federal contract awards (federal buyers) in the same industry in Arkansas, from USAspending.gov. These are other jobs, not the same work as this one. Do not use them as a price guide for this job.
Who won
Amount
Buyer
Date
Patton Contractors INCConstruction services located at little rock federal building 700 W capitol AVE, little rock, AR