Database: Migrate approximately 20,000 tags, including 2,000 alarm/callout tags and 2,500 historized tags; configure the Ignition database and historian.
Due
December 10, 2026
32 days left
Location
Utah
Posted on
Bonfire
Please quote conversion from GE iFIX to Ignition for the monitoring and control system at Jordan Basin Water Reclamation Facility, 13826 South Jordan Basin Lane, Riverton, UT 84065, and associated lift stations.
Database: Move approximately 20,000 data points, including 2,000 alarm/callout points and 2,500 points with recorded history; set up the database and history storage.
Screens: Build approximately 150 screens with popups and 12 navigation dropdown areas.
Connections: Connect 60 Emerson controllers using GE Ethernet and approximately 10 Modbus TCP/IP devices.
Alarms: Switch alarm calls to internet phone or cellular service and add text messages using an AirLink XR60 or similar device.
Services: Include staff coordination, training, startup, testing, and support for a facility operating around the clock; finish by November 30, 2027.
Qualifications: Provide two Gold-certified Ignition integrators, a Wasatch Front office with at least two local integrators, three wastewater Ignition integration references, and one GE iFIX-to-Ignition reference.
Please confirm availability and send your quote by December 10, 2026.
The original documents
Deadline: December 10, 2026
See the original on utah.bonfirehub.com
Bidding it yourself? Get the full package and submit on Bonfire before December 10, 2026.
What they need
ScreensBuild approximately 150 screens with popups and 12 navigation dropdown areas.
CommunicationsIntegrate 60 Emerson PLCs using GE Ethernet and approximately 10 Modbus TCP/IP devices.
Alarm calloutsTransition to VoIP or cellular and add SMS capability using an AirLink XR60 or similar device.
Training and testingInclude staff coordination, training, startup, testing, and support for a facility operating 24/7.
QualificationsTwo Gold-certified Ignition integrators, a Wasatch Front office with at least two locally based integrators, three wastewater Ignition integration references, and one GE iFIX-to-Ignition reference.
PricingInclude labor, travel, and additional fees. Ignition software and Kepware drivers are already installed; exclude software costs.
CompletionComplete integration by November 30, 2027.
Past history: who won IT Services & Software work in Utah
Recent federal contract awards (federal buyers) in the same industry in Utah, from USAspending.gov. These are comparable jobs, not earlier rounds of this exact solicitation.
Typical award:$49K to $1.6Mmiddle half of 13 recent awards · median $355K