Art Barn Renovation and Accessibility Improvements
Closed October 9, 2026closed · Utah
This bid is for renovation and accessibility improvements at Art Barn Arts Council Offices and Finch Lane Art Gallery, 54 South Finch Lane, Salt Lake City, Utah 84102.
This bid has closed.
Buyers often post the same work again. Set an alert below and we will email you when a similar Utah bid is posted.
What the job is
Interior renovations: Selective demolition, office and storage-closet remodeling, gallery hardwood flooring, office carpeting, resilient base, painting, and acoustical ceiling modifications.
Accessibility and exterior work: Main-entry renovations, existing ramp removal, accessible entrance relocation to the north door, accessible walkway from parking, railings, earthwork, and concrete paving.
Building systems: New gallery/exhibit lighting, related electrical work, and HVAC modifications.
Related finishes: Carpentry, architectural woodwork, cabinets, countertops, doors, frames, hardware, and signage.
Pricing: Lump-sum quote covering labor, materials, equipment, and installation per drawings and specifications; site visit required to assess existing conditions.
Schedule and site conditions: Complete by January 21, 2027, including winter shutdown days. Premises remain occupied; maintain exits and access. Normal work hours are Monday–Friday, 8:00 a.m.–5:00 p.m.
Qualifications: Utah licensing required; include performance and payment bonds, each for 100% of the contract price.