This bid is for preliminary engineering for the Medford Canal Piping Phase 1 project, from Bradshaw Drop to Yankee Creek, approximately eight miles northeast of Medford in the Little Butte Creek watershed, Jackson County, Oregon.
Due
December 4, 2026
26 days left
Location
Jackson County, OR
Oregon
Posted on
OregonBuys
Please quote preliminary engineering for approximately 2.7 miles of the Medford Canal Piping Phase 1 project, from Bradshaw Drop to Yankee Creek in Jackson County, Oregon.
Design: Bring conversion of open canal to buried pipeline using gravity for water pressure to 30% preliminary design.
Survey: Survey ground elevations, coordinate utilities, and prepare a terrain model, base maps, and preliminary property and easement drawings.
Ground testing: Explore and test ground conditions and recommend trenching, groundwater, unstable clay slope, bedding, and backfill measures.
Water flow: Evaluate pipe size and pressure, connection to the existing approximately 60-inch Bradshaw Drop pipeline, water outlet upgrades, valves, and three seasonal drainage crossings.
Deliverables: Provide draft and final 30% drawings, a water flow model and calculations, ground investigation reports, a Basis of Design Report, construction cost estimate, and implementation schedule in PDF and editable source files.
Professional requirements: Provide Oregon-licensed engineering and surveying oversight, independent technical review, and environmental and permit-related design support.
Please confirm availability and send your quote by December 4, 2026.
The original documents
Deadline: December 4, 2026
See the original on oregonbuys.gov
Bidding it yourself? Get the full package and submit on OregonBuys before December 4, 2026.
What they need
Design scopeAdvance approximately 2.7 miles of open canal conversion to buried gravity-pressurized pipeline to 30% preliminary design.
Survey and mappingTopographic survey, utility coordination, terrain model, base mapping, and preliminary property/easement exhibits.
Geotechnical investigationField exploration and testing with recommendations for trenching, groundwater, unstable clay slopes, bedding, and backfill.
Hydraulic analysisPipeline sizing and pressure evaluation, tie-in to the existing approximately 60-inch Bradshaw Drop pipeline, turnout upgrades, valves, and three seasonal drainage crossings.
DeliverablesDraft and final 30% drawings, hydraulic model and calculations, geotechnical memoranda, Basis of Design Report, construction cost estimate, and implementation schedule; provide PDF and editable source files.
Professional requirementsOregon-licensed engineering and surveying oversight, independent technical review, and environmental/permitting design support.
Past history: who won Construction & Renovation work in Oregon
Recent federal contract awards (federal buyers) in the same industry in Oregon, from USAspending.gov. These are comparable jobs, not earlier rounds of this exact solicitation.
Typical award:$65K to $217Kmiddle half of 15 recent awards · median $148K