Scope: Install a paddle switch, automatic operator, and all necessary hardware for the single-occupancy restroom door in Room 105, including power connections and wiring.
Can you do this job? Tell us your price.
We write the bid, handle the paperwork, and submit it for you. No upfront fees.
Got it.
You send a priceOne number, before October 30, 2026.
We bid itXL Eagle submits the bid as the main contractor.
You do the workIf it is awarded, you do the job as our subcontractor.
Equipment: Surface-mounted, low-energy operator with battery backup; basis of design is ASSA ABLOY SW100, with compliant Stanley or NABCO products also acceptable. Include a wireless steel push plate with accessibility markings.
Standards: Meet ADA and ANSI/BHMA A156.19-2019 requirements; include adjustment, required signage, AAADM-certified inspection, and a one-year warranty.
Site conditions: Building remains occupied. Clean daily and paint exposed conduits in public areas to match surrounding surfaces.
Schedule: Work Monday–Friday, 7 a.m.–5 p.m.; complete by November 30, 2026. Ohio contractor licensing required.