Water main: Replace 4-inch ductile iron piping from the existing Romac coupling into the concrete vault with 4-inch C-900 DR-14 pipe and a new MJ coupling; connect back to existing piping outside the vault with a new MJ coupling.
Meter and check valve: Replace the 4-inch flanged water meter and install a 4-inch silent check valve inside the vault.
Service taps: Install three 4-inch x 1-inch saddle taps: an air vent with 1-inch ball valve and nipples; a sampling port with nipple and ball valve; and a chlorine injection connection after the check valve with 1-inch Schedule 80 nipple and ball valve.
Site restoration: Seal vault penetrations, perform a water leak test, bed all pipe in sand, backfill and compact ditches, reset valve boxes, and remove debris.
Equipment and access: Include all equipment and materials, with materials subject to maintenance approval. Site access requires one day's notice and a maintenance escort.
The basics
Due
November 3, 2026 13 days left
Where
Nevada
Posted on
nevadaepro.com
Solicitation
40DHHS-S4053
What the solicitation documents require
We read the solicitation documents for this bid (11 documents, 33 pages). Each item shows the file and page it came from. Check the original documents and any addenda before you bid.
All questions regarding this solicitation shall be submitted via the bid Q&A feature on the bid solicitation at nevadaepro.com by the deadline listed in the solicitation timeline (40DHHS-S4053-Terms and Conditions, p. 1)
Vendors shall submit quotes or responses via create quote in the State electronic procurement website, nevadaepro.com (40DHHS-S4053-Terms and Conditions, p. 3)
Deadline for questions No later than 5:00 pm on 10/22/2026 Answers posted On or about 10/26/2026 Deadline submissions and opening No later than 2:00 pm on 11/02/2026 Evaluation period (estimated) 11/03/2026-11/05/2026 Notice of intent (estimated) On or about 11/05/2026 Notice of award (estimated (Request for Proposals 40DHHS-S4053 Water Well Repair, p. 3)
Insurance
3. Worker's Compensation and Employers' Liability Workers' Compensation Statutory Employers' Liability Each Accident $100,000 Disease - Each Employee $100,000 Disease - Policy Limit $500,000 Policy shall contain a waiver of subrogation against the State (40DHHS-S4053-Insurance Schedule, p. 1)
Title page Table of contents Trade secret information, cross referenced to the technical proposal (alternatively, a redacted technical proposal and a full confidential technical proposal can be submitted) Cost proposal Confidential business information (Request for Proposals 40DHHS-S4053 Water Well Repair, p. 4)
A billing submitted after the first Friday in August and processed as a stale claim pursuant to NRS 353.097, shall subject Contractor to an administrative fee not to exceed $100.00 (40DHHS-S4053-Terms and Conditions, p. 6)
Replace 4inch water main, meter and check valve at NYTC Well house: Replace 4” Ductile Iron from 4” Romac coupling and install new 4” MJ coupling and C-900 DR-14 pipe into concrete vault; Replace 4” Flanged Water Meter; Install 4” C-900 DR-14 with 4” x 1” saddle tap/1” Ball Valve and 1” Air Vent wit (Request for Proposals 40DHHS-S4053 Water Well Repair, p. 2)