This bid is for air receiver tank replacement at the Septage Facility, 47 Workshop Road, South Yarmouth, Massachusetts.
Due
November 25, 2026
12 days left
Location
South Yarmouth, MA
Massachusetts
Posted on
COMMBUYS
Notice ID
BD-27-1355-PRC-YPRC-135328
Please quote replacing the 400-gallon air receiver tank, with piping, valves and crane lifting, at the Septage Facility, 47 Workshop Road, South Yarmouth, Massachusetts.
Tank: Remove the existing 400-gallon tank and install the owner-supplied Steel Fab A10055 400-gallon vertical tank rated for 165 PSI.
Access: Remove and reinstall a wall louver about 68 inches wide by 72 inches high, with its bottom about 18 feet above ground, including crane or lifting equipment, rigging and labor.
Piping: 2-inch 304 stainless steel Pro-Press piping, fittings and outlet ball valve; reconnect the existing bypass; include needed reducers and plugs. All piping and fittings galvanized or stainless steel.
Drain and accessories: 1-inch drain line and ball valve to the floor drain, a 1/2-inch bypass with ball valve, and the supplied 125 PSI relief valve, pressure gauge and auto-bleeder valve.
Completion: Startup, leak testing, permits and cleanup included; finish within 30 days of authorization to begin, working Monday to Friday, 7 a.m. to 3 p.m., with shutdowns coordinated in advance.
Insurance: Contractors must be licensed and insured.
Please confirm availability and send your quote by November 25, 2026.
The original documents
Deadline: November 25, 2026
See the original on www.commbuys.com
Bidding it yourself? Get the full package and submit on COMMBUYS before November 25, 2026.
What they need
Tank replacementRemove the existing 400-gallon tank and install an owner-supplied Steel Fab A10055 400-gallon vertical tank rated for 165 PSI.
Access and liftingRemove and reinstall a wall louver approximately 68 inches wide by 72 inches high, with its bottom approximately 18 feet above ground. Include crane or lifting equipment, rigging, and labor.
Air pipingInstall 2-inch 304 stainless steel Pro-Press piping, fittings, and an outlet ball valve; reconnect the existing bypass and include necessary reducers and plugs.
Drain and accessoriesInstall a 1-inch drain line and ball valve to the floor drain, plus a 1/2-inch bypass and ball valve. Install the supplied 125 PSI relief valve, pressure gauge, and auto-bleeder valve. All piping and fittings must be galvanized or stainless steel.
CompletionInclude startup, leak testing, permits, and cleanup. Complete within 30 days of authorization to begin; work hours are Monday–Friday, 7 a.m.–3 p.m., with shutdowns coordinated in advance.