Electrical: Replace the 100-amp panel with a 150-amp panel; add a three-circuit garage subpanel, 50-amp range circuit, five smoke/CO detectors, three-way bedroom switches, bathroom fan switch, and dining chandelier.
Can you do this job? Tell us your price.
We write the bid, handle the paperwork, and submit it for you. No upfront fees.
Got it.
You send a priceOne number, before October 26, 2026.
We bid itXL Eagle submits the bid as the main contractor.
You do the workIf it is awarded, you do the job as our subcontractor.
HVAC: Install two independent, AHRI-matched 9,000 BTU/h ductless systems: a living room heat pump and an upstairs bedroom cooling-only unit. Include wired controls, precast pads, and covered line sets; reroute line sets for two existing outdoor units. Test and report on the boiler/hydronic system, remove approximately 40 linear feet of living room radiators, and remove the propane tank and range piping.
Waterproofing: Install approximately 65 linear feet of interior basement drainage with wall vapor barrier, sump discharge, concrete restoration, and backup operation during power outages.
Interior: Replace basement stairs and railings; install approximately 324 square feet of R-23 mineral wool insulation; replace eight ceiling tiles and repair molding; restore the kitchen landing door; replace the sink cabinet bottom; supply and install a 30-inch electric range.
Exterior: Apply approximately 226 square feet of three-coat chimney stucco, replace four bricks, and install two custom 20-ounce copper chimney crowns. Replace approximately four slate shingles; repair the brick stoop, screen door, and historic basement door with mortise lockset. Replace shed roofing and repair approximately five square feet of damaged sheathing.
Garage fire alarm: Install a standalone control panel with cellular communicator, two hardwired heat detectors, and exterior bell, including signal survey, programming, testing, and certification.
Execution: Include all labor, materials, equipment, and disposal; verify dimensions onsite. Complete within 90 calendar days and provide a two-year workmanship warranty.