75 Gold Nugget Lane: Remove a driveway gate system, two directional signs, a wood sign post, an abandoned electrical meter and support, and eight campsites’ water, electrical, and septic hookups and connecting lines, including concrete-filled steel bollards.
Can you do this job? Tell us your price.
We write the bid, handle the paperwork, and submit it for you. No upfront fees.
Got it.
You send a priceOne number, before October 26, 2026.
We bid itXL Eagle submits the bid as the main contractor.
You do the workIf it is awarded, you do the job as our subcontractor.
Septic and well: Remove the 1,500-gallon septic tank and drainfield, log and wood-frame well house, concrete well enclosure, and footings. Include well closure by a licensed water well contractor and closure documentation.
Town Creek Road: Remove the gate system at 2335 and four-rail wood fencing at 1932, comprising seven front sections and four side sections, including posts and footings.
Removal and disposal: Remove all associated foundations, footings, necessary vegetation, and debris; haul to an appropriate landfill or recycle. Arrange utility locates and keep work within designated demolition limits.
Site restoration: Backfill voids to 95% compaction, grade for positive drainage, smooth disturbed areas, and provide erosion controls, temporary seeding, and 2–4 inches of straw cover.
Site verification: Visit the sites to verify quantities and conditions before quoting.