What they need
- Removal and pipingRemove existing 8-inch ABZ butterfly valves and adjoining components as needed. Supply Felker custom transition spools, reducers, fittings, flanges, gaskets, hardware, and supports to connect the new assemblies to the existing air distribution system; field-verify dimensions.
- Testing and closeoutInclude startup, commissioning, operational testing, warranties, and operation and maintenance manuals. Facility technicians will disconnect and reconnect power and automation wiring.
- Pricing and scheduleInclude labor, materials, equipment, transportation, permits, insurance, bonds, applicable taxes, and cleanup. Completion is required within 60 calendar days; please identify equipment lead times.
- Site visitMandatory meeting and site visit on November 24, 2026, at 1:00 p.m. Mountain Time, starting in the facility administration building conference room.