This bid is for planning and preliminary design services for the Grand Canal multi-use path from 47th Avenue to 23rd Avenue in Phoenix, Arizona.
This bid has closed.
Buyers often post the same work again. Set an alert below and we will email you when a similar Arizona bid is posted.
What the job is
Corridor: Approximately 3.5 miles, with a multi-use path at least 12 feet wide, cross-canal pedestrian bridges, and connections to bike lanes and surrounding neighborhoods.
Crossings: Develop preferred alternatives for safe, accessible, grade-separated crossings at Interstate 17 and US-60/BNSF Railway.
Deliverables: Preliminary engineering, 15% design plans for the preferred concept, a Project Assessment Report, and environmental review supporting NEPA clearance.
Coordination and engagement: Coordinate with transportation, canal, railway, and utility stakeholders; prepare materials for and participate in up to four community meetings, four preparation meetings, three community walks, and public pop-up site visits.
Amenities: Evaluate safety improvements, signalized pedestrian crossings, nature-based landscaping, chilled drinking fountains, shaded seating, and local art.