This bid is for traffic calming design and community engagement services along approximately 3.8 miles of El Molino Avenue, from Atchison Street to Bonita Drive, in Pasadena, California.
Can you do this job? Tell us your price.
We write the bid, handle the paperwork, and submit it for you. No upfront fees.
Got it.
You send a priceOne number, before November 6, 2026.
We bid itXL Eagle submits the bid as the main contractor.
You do the workIf it is awarded, you do the job as our subcontractor.
Design: Develop quick-build concepts, 30%, 60%, and final plans, specifications, and cost estimates for temporary bicycle, pedestrian, and traffic calming improvements. Include AutoCAD/PDF deliverables, accessibility compliance, vehicle turning analysis, and environmental clearance documentation.
Traffic analysis: Before-and-after collection covering eight multimodal segment counts, four intersection turning counts, and two speed surveys per phase; include baseline crash analysis and an editable evaluation report template.
Community engagement: Up to eight community events, six advisory meetings, four stakeholder events, and four presentation briefings; translated materials, surveys, four design graphics, four 3D renderings, and four mailing rounds to up to 21,000 addresses.
Project support: Project management, up to 36 project meetings and six coordination meetings, bidding and construction design support, and as-built drawings.
Qualifications and schedule: California Professional Engineer license required. Anticipated January 2027 start, design completion within 12 months, and overall services within 18 months.
Pricing: Provide a total lump-sum quote with task-level fees, staff hours/rates, and all travel, printing, mailing, and other direct costs.